CU-610H Tech Docs

Cover

19-001 CU-610H Documentation

Hydrogen Controlled Atmosphere Infrared Belt Furnace

Furnace Operating Manual

ChapterChapter TitleType (status)Link
Ch-0Introduction, Warranty, ContentsPRIVATE (10/07/2020)pdf
Ch-1Furnace EquipmentPUBLIC
(rev 1 10/05/2020)
pdf
Ch-2InstallationPUBLIC
(rev 1 10/06/2020)
pdf
Ch-3Equipment OperationPUBLIC
(rev1 10/06/2020)
pdf
Ch-4Service & MaintenancePUBLIC
(rev 1 10/06/2020)
pdf
Ch-5Process EngineeringPUBLICpdf
Ch-6Thermal Processing TheoryPUBLICpdf
Ch-7SpecificationsPUBLIC (5/29/2020)pdf
Ch-8Drawings & SchematicsPRIVATE (12/22/19)pdf
Ch-9moved to M  
Ch-10APPENDIX (index)PUBLICpdf
10-1Oxygen AnalyzerPUBLICpdf
10-2Hydrogen OperationPUBLICpdf
10-3Uninterruptable Power SupplyPUBLICpdf
10-4OT Over Temperature ScannerPUBLICpdf
10-5Ashcroft Explosion Proof SwitchesPUBLICpdf
10-6NOVA Combustible Gas DetectorPUBLICpdf
Section GGlossaryPUBLICpdf
Section MMSDSPUBLICpdf

 

Videos on Furnace Equipment Operation

VideoTitleTypeLink
MP4-01Operation of motorized separation (chamber opening & belt running)Publicpdf
MP4-02Operation of motorized separation (opening chamber)Publicpdf
MP4-03Operation of motorized separation (closing chamber)Publicpdf
MP4-04Operation of motorized separation (cooling section)Publicpdf
MP4-05Operation of motorized separation (side view of belt)Publicpdf
MP4-POperation of motorized separation (opening)Publicpdf
YT-CAWCOperation of motorized separation (cooling section-youtube)Publichtml

 

 

<< Manual Index this page:  CU-610H ManualDrawings >>

New Furnaces
Used Furnaces
eMail for Quote

Corporate Offices:

30025 Alicia Pkwy #417
Laguna Niguel CA 92677 USA

P: 1.949.218.4996

LCI Furnaces

Current Time
Orange County CA USA:

Office Hours:

Monday - Friday
7:00 AM - 4 PM PST

FurnacePros Furnace Pros for RTC Infrared IR Production Belt Furnace Help